ALEX CORPORATION
On Feb. 13, 2015, the Ministry of Mines and Energy granted the license to Alex Corporation through Letter 0087. The Coach is a licensed exploration license for bauxite on an area of 360 square kilometers. After completing the study, Alex Corporation has teamed up with Aluminum Development (Cambodia) Corp. to carry out its next steps on download and business activity. Also, Aluminum Development (Cambodia) Corp. has registered trade in the list of Ministry of Commerce by letter No. 10527, dated September 16, 2015, registered under Co. .3406 KH / 2015.
The project area is between 735,000 and 756,000 east longitudinal distances and between 13,800,000 and 13,600,000 of the Northern Territory. The project area covers an area of 26,270 hectares covering 11 villages of Pom Pheng village of Monorom, Puuong village, Poutan village, Romanea commune, O’Spean village, Chamkar Tek village, Sangkat Spean Meanchey within administration area. Of Sen Monorom and Pou Lao Pho Chop and Putueng of Kdadam commune, Puhum village, Peoung village, Putu village, Sen Monorom commune, Ore district. Hawks. The total area of the project is located in 11 administrative zones of 02 communes and 3 communes of 01 district and 1 capital of Mondulkiri Province. In the 33-year project action plan, the project will cost $ 246,674,346. Below is a project action plan.
Based on the estimated resources in the project area, there are about 200.88 million tons, of which the remaining bauxite resources are deducted from the residual area of protected areas and linkages of 191.63 million, Carry out its extraction activities in the amount of 6.4 million tons per year. The project will cover 30 years of operation in bauxite extraction and 3 years for construction of basic construction projects in the project area.
In the bauxite extraction, the project is divided into two phases in a 15-year phase-out. In Phase 1, the project to divide the area of extraction of 08 areas, zone 1, starting from 2020 and ending in 08 by 2034 with a total area of 4,710 hectares. In the second phase, the zone is divided into six zones, zone 9, starting from 2035 and ending in zone 14 in 2049 with a total area of 3,295 hectares. The total activity of the extraction period is 30 years, which is divided into 14 areas, covering an area of 8,005 hectares.
The original mineral resources in the project area were found to be stagnant along the red-lumped layer, which is located in layer 2 of the top layer. The volume of mineral resources in the project area is seen in the range of 0 to 8 meters, with an average of about 3.18 meters. Characteristics of the original mineral resources in the Al2O3 project area are present at the top, with a much lower depth of presence, as opposed to the deeper SiO2 presence.