HAN SENG COAL MINE CO., LTD.
To comply with the Law on the Protection of the Environment and Natural Resource Management of the Kingdom of Cambodia, promulgated in 1996 and the Sub-decree on the environmental impact assessment process announced in 1999, including Part 1. 6 non-metallic minerals, 1.6.7 (all sizes) are set to evaluate Environmental effects.
Considering the legal nature of the Kingdom of Cambodia, the company has been working with the company to obtain a properly documented Environmental Impact Assessment Report to prepare this comprehensive Environmental and Social Impact Assessment Report.
– Company name: Han Seng Co Man Co., Ltd
– Company headquarters: # 6, Street 416, Sangkat Tumnub Tek, Khan Chamkar Morn, Phnom Penh
– Business Registration Identification Number: Certificate 5327, Certificate of Business Registration dated September 2011
– Category: Private Limited Company
– Project life: 40 years
– Registered capital: $ 1,000,000
– Investment capital: 100,000,000 USD
– Type of project: Limestone business
The Limestone Project is located in the north of Cambodia, located in the area of Phnom Thmey, LouvongTong, Anlong Veng, Otdar Meanchey and some 450 kilometers away from Phnom Penh. Traveling from Phnom Penh, the project area is on the road. National Road 6 passes through Kompong Thom and Siem Reap and will continue to cross National Road 67 to Anlong Veng district. The business area is a remote area of Samrong about 41.9 km, about 42.43 km from Trapeang Prasat and about 16.94 km from Anlong Veng.
The project lasts for 40 years, with the first three years of construction and construction work in the project starting from 2016 to 2018, starting in 2019 and ending in 2056.
In limestone extraction, the use of water for day-to-day use of the staff, irrigation, and environmental rehabilitation (Green Zone) is gradually restored. The design for this job will be focused on systemic security, with both the acceptance of quality for use.
The project’s pond location will be built on an area of about 1.57 hectares. The first bath was built around 189 meters from the project’s stockpile of storage and about 66 meters from the project’s stockpile. At the same time, the site is approximately 210 meters from the project site’s crushing facility.
The project’s pond will be built at a depth of about 5 meters, with a storage capacity of 78,500 cubic meters for use. At the same time, the project’s pond will be used for irrigation, irrigation, watering, burrowing, but not recruited for workers’ food supply.
Wells are drilled wells and are constructed in a location near the living quarters of workers with abysses: 388154 Oranges 1562264. Wells that will be built at a depth of at least 45 meters to ensure the water supply for the living needs of the project’s staff.
To solve the problem, the lack of electricity for the project will use two generators, two diesel engines (one for use and one reserve) with a capacity of 1.000 kilowatts. For use, it requires a 16-hour engine running every day from 6am to 21pm.
In order to operate in its production line, the project will use fuel in its engine operation of 883.8 liters / day or 0.7349 ton / day. In the limestone mining project, the company has used 29 machines, of which about 5.1 tons of lubricants per month and about 51 tons per year. The amount of explosives used in the blast amounted to 512 tons per year. All of these explosions will also be imported from the National Superintendent.
The download process is a 330-day, 330-day limestone extraction per year, 8 hours a day divided into two turns. Morning from 7:00 to 11:00 pm and Afternoon from 13:00 to 17:00.
Employees – Permanent Project Workers at Compound Limit Remediation: 20 companies, of which 19 are Cambodian and one Chinese. For Employees – All selected laborers will receive pre-training such as job safety before starting work.